syteOn
Login Book a Walkthrough
Solutions / Pools
Pool contractors

From first design to first swim — keep the whole pool project connected.

Connect leads, design, selections, permits, project phases, crews, subcontractors, customer communication, change orders, progress billing, and job financials around the same pool project.

{{ k.v }}
{{ k.k }}
Active projects $474,600 under contract
Project Value Phase PM Attention
{{ p.name }} {{ p.value }} {{ p.phase }} {{ p.pm }} {{ p.attention }}
Figures shown are demo tenant data.
{{ t.what }}

Today across the company.

The disconnected build

A six-month pool project shouldn't live in six different systems.

Where the project lives today
{{ s.stage }} {{ s.where }}
What gets lost
{{ w }}
One record
{{ o }}
One pool project record.
The pool lifecycle
{{ l.num }} {{ l.stage }}
{{ i }}
Eleven phases, a dozen trades, and one homeowner watching — on one record.
Property & design

Turn the customer's vision into a project the company can actually build.

The design starts with the site — access, setbacks, slope, and the HOA all shape what's buildable.

Martinez Residence 812 Ridgeview Dr
{{ p.k }}
{{ p.v }}
Project request
{{ r }}
10 ft of rear access decides the excavation method, the haul plan, and the equipment — before anything is priced.
Configuration 3D design tools — connected
{{ c.k }}
{{ c.v }}
{{ o.tier }}
{{ o.price }}
{{ o.name }}
{{ d.label }}
Design files and renderings are uploaded from your design tools and attached to the project. syteOn doesn't generate pool designs.
Selections & estimate

Tile, coping, deck, finish, and equipment shouldn't live in text threads.

The project knows what was chosen, who approved it, when, and which phase it's holding up.

Selections 4 of 6 approved
{{ s.item }}
{{ s.choice }}
{{ s.state }}
Status vocabulary {{ st }}
The deck selection is the one blocking a phase — everything else is moving.
Estimate by phase & trade Pool + spa
{{ e.k }} {{ e.source }} {{ e.v }}
Awarded subcontractor bids become committed cost on the project — no second spreadsheet.
Before the dig

The project should be ready before the excavator shows up.

The easiest construction delay is the one you see before excavation.

Pre-construction checklist
{{ p.what }} {{ p.state }}
Blocking the next start
Deck selection — 82% of selections complete
Your brand Proposal · Martinez
Pool + spa · 15 × 30 with 7 × 7 spa
$128,400
{{ p }}
{{ a.label }}
Scope, options, selections, allowances, exclusions, phases, and the payment schedule — in the homeowner's language, under your brand.
The build

A pool is a sequence of dependent phases.

Martinez — pool + spa Week 11 · phase 6 of 11
{{ p.num }}
{{ p.name }}
{{ p.state }}
Deck can't start until coping is complete. Interior finish waits on equipment set and the final inspection. Dependency automation — planned
Project #4402 · Sarah M.
Martinez — Pool + Spa
Active Tile + Coping
{{ k.k }}
{{ k.v }}
{{ k.note }}
{{ tabTitle }}
{{ r.a }}
{{ r.b }}
{{ r.c }}
Needs attention
{{ a.what }} {{ a.who }}
Trades on this project
{{ t.name }} {{ t.state }}
Inspections, field & materials

The next phase can't move until today's work passes.

Inspection gate
{{ i.what }} {{ i.state }}
When the electrical inspection passes, your PM releases the deck phase — the release is a person's call, recorded on the project.
Today in the field
{{ f.at }}
{{ f.what }}
Draft summary Review to Post
Waterline tile installation began today. Coping material arrived and electrical inspection remains confirmed for tomorrow morning.
Long-lead items Supplier ordering — planned
{{ m.what }} {{ m.state }}
Deck material is at risk — and the reason is a customer selection, not a supplier.
Decisions & changes

A delayed homeowner decision can delay the next trade.

And hidden site conditions shouldn't become free work.

Deck selection Due Friday
{{ d }}
{{ i.k }} {{ i.v }}
Selection needed by Friday to protect Monday's deck start — the due date is tracked on the project, and your team decides how to chase it.
Change Order #4 · found at excavation · 5 photos

Groundwater and unsuitable soil at the deep end — the hole won't hold to grade without dewatering and stabilization.

{{ c.k }} {{ c.v }}
+2 days · schedule reforecast Customer approved
Customer-driven upgrade

"Can we add a second bubbler to the sun shelf?"

{{ u }}
Change Order #2 · +$1,850 Approved
All approved changes
{{ c.no }} {{ c.why }} {{ c.amount }}
Your brand Homeowner portal
Martinez — pool + spa 58%
{{ p.k }} {{ p.v }}
Waiting on you
Deck selection — 3 options to review
{{ n }}
The homeowner sees the project. Your team sees the operation behind it. Explore Client Experience →
Photos by phase 86 internal · 18 shared
{{ p.phase }} {{ p.count }}
A pool build is six months of a backyard being unusable. The photo record is what makes that bearable for the homeowner — and it carries the change orders and the closeout package too.
Billing & project health

Know what the pool is making before the water goes in.

Progress billing $137,000
{{ b.stage }} {{ b.pct }} {{ b.amount }} {{ b.status }}
Each milestone becomes billable when its phase is signed off. $75,350 collected, $27,400 ready, $34,250 remaining.
Project health
{{ f.k }} {{ f.v }}
Budget vs forecast {{ b.label }}
Committed subcontractor cost
{{ c.who }}
{{ c.trade }}
{{ c.amount }} {{ c.state }}
The awarded bid becomes committed cost on the job budget. See Get Paid →
First swim & after

The project isn't finished just because the pool is full.

Startup & handoff
{{ s.what }} {{ s.state }}
Startup and water chemistry follow your company's own process and documentation — syteOn tracks that the steps happened, not how to perform them.
Closeout
{{ c.what }} {{ c.state }}
Project closed Completed
The relationship doesn't end at construction
{{ f.what }} {{ f.when }}
Future projects attach to the same customer, property, and pool record. Recurring pool service — planned
Across the company

See design, permitting, construction, billing, and margin together.

The portfolio
{{ k.k }}
{{ k.v }}
Needs attention
{{ a.what }} {{ a.when }}
Where AI helps
{{ a.stage }}
{{ a.what }}
Engineering, structural requirements, inspections, and water chemistry stay with your licensed professionals. Explore AI →
syteOn recommends. Your team decides.
One project, many views

Same pool project. Different view.

{{ r.who }}
{{ i }}
What it consolidates
{{ c }}
Accounting, payroll, payment processing, and your design tools stay connected where appropriate.

One pool project. Every phase. One operating record.

{{ c }}

Bring one real pool project — one you're designing, building, or recently completed — and we'll walk it through syteOn from first lead to final handoff.

Book a Walkthrough See Other Trades