Plan work

Put the right people on the right jobs at the right time.

syteOn plans work around service areas, skills, crew capacity, calendars, buffers, job duration, and travel time — so your schedule reflects what your team can actually execute.

Thursday — Zone North 14 Scheduled · 11 Confirmed Dispatch
{{ d.time }}
{{ d.who }}
{{ d.what }}
{{ d.status }}
Route
{{ r.stop }}
{{ r.leg }}
Day total
37 mi · 1h 04m
syteOn recommended David for the Whitfield estimate — service area, availability, skill, and a 35-minute drive from his prior stop.
The real schedule

A free time slot doesn't mean the job fits.

Calendar availability
David is free at 9:30 AM.
{{ c }}
Not actually available.
Operational availability
syteOn checks first, then recommends.
{{ cl }}
Recommended: David R. — Thursday 9:30 AM, 35-minute drive.
No re-entry

The job arrives with its context already attached.

Sales doesn't throw the job over the wall. Operations starts with the context already there.

{{ n }}
Won job → Plan Work Won
{{ w.k }} {{ w.v }}
Same job. No re-entry.
Match the work

Available doesn't mean qualified.

The person has to match both where the work is and what the work requires.

Where — service areas
{{ z.name }}
{{ z.detail }}
{{ z.load }}
4418 Barrington Rd falls inside Zone North.
Coverage by service
{{ c.who }} {{ c.role }}
{{ s.label }}
Who — requirements
Electrical panel upgrade
Electrical Residential 2-person crew
{{ c.name }}
{{ r.label }}
{{ c.verdict }}
Skills, services, and crew size are configurable per person and crew. License tracking — planned
Capacity

Protect your estimators' selling time.

Don't fill every empty slot. Build a day your team can execute — and know what the company can still take on.

David R. — Thursday 3 estimates
{{ e.time }} {{ e.name }} {{ e.kind }}
{{ d.label }}
{{ d.value }}
{{ g.head }}
{{ r.name }} {{ r.value }}

Utilization is calculated from scheduled hours against configured availability, across the next 14 days. Figures shown are demo tenant data.

Travel matters

Stop building schedules your crews can't actually drive.

Same three jobs. Same day. Two very different schedules.

{{ rt.label }} 3 jobs
{{ s.time }} {{ s.name }}
{{ s.leg }} drive
Miles
{{ rt.miles }}
Driving
{{ rt.driving }}
Same work. Less windshield time. Placement recommendations only — your dispatcher sets the final sequence.
Real-world scheduling

Jobs don't happen back-to-back with zero minutes between them.

{{ r.k }} {{ r.v }}
Between two appointments
{{ b.name }} {{ b.dur }}
The next appointment can start at 10:53 AM — not 10:15.
Crews, resources & sequence

Schedule the crew around the work, not just the date.

A three-day paver install isn't a one-hour service call. syteOn plans both.

Project
Alvarez — Paver Patio
{{ p.k }} {{ p.v }}
Three-day plan — Crew 1
{{ d.day }}
{{ d.work }}
{{ d.detail }}
Resources on the plan Equipment planning — planned
{{ r.label }}
Dependencies Sequencing — planned
{{ dp.label }}
Decking can't start until electrical rough-in is complete.
Subcontractors Whitfield — Deck Rebuild Electrical package · Wednesday
{{ s.name }}
{{ s.trade }}
{{ s.availability }} {{ s.bid }} {{ s.status }}
Employees, crews, and subcontractors all affect the same project plan.
One view

Estimates, crews, projects, and subs on one calendar.

One operational picture instead of five separate calendars.

Filter Mon – Fri · this week
{{ wd }}
{{ ln.group }}
{{ ln.name }}
{{ cell.label }}
Reality changes

Your schedule should know when the day changes.

8:47 AM · conflict detected
Crew 1 is running 90 minutes late at Dunmore Retail.
Affected
{{ a.time }} {{ a.job }} {{ a.note }}
Options
{{ o.key }}
{{ o.what }}
{{ o.effect }}
{{ o.status }}
Manager approved Option A.
{{ n.who }}
{{ n.what }}
{{ n.status }}

Customer-facing messages are prepared for review, not sent automatically.

syteOn recommends. Your team decides.

Can recommend
{{ a }}
Your team approves
{{ t }}
See ahead

Know where the schedule breaks before it breaks.

Next week — utilization & coverage
{{ n.k }} {{ n.v }}
Suggested adjustments planned
{{ s }}

Utilization and coverage are available today. Proactive conflict-risk scoring and suggested adjustments are planned. Figures shown are demo tenant data.

The complete flow

From won work to executable work.

{{ f.num }} {{ f.name }}
Handoff to Build Work
Same job. Same scope. Same people. Same context.
Explore Build Work

One operational schedule instead of disconnected calendars.

{{ r }}
syteOn Plan Work

Different views. Same schedule.

{{ r.who }}
{{ ri }}

Build a schedule your team can actually run.

Walk through your service areas, estimators, crews, travel rules, capacity, and current scheduling workflow inside syteOn.

Book a Walkthrough Explore Build Work